Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Note

Before using this tab, you must have selected at least one file in the Upload tab then clicked Run.

After clicking Run, the ‘Report’ tab is populated with specific information for each of the part files selected in the Upload tab.

Info

For an example of how to use the Report tab, see Using the Cycle Time Estimator: an Example.


The following table contains details of all the information contained within the ‘Report’ tab, as shown in the screenshot to the right.

#

Information

Description

1

Results created at

The date and time that the estimates were calculated.

2

Part file name

The name of the part file (and its Fusion path).

Info

The arrow to the left of the part file name can be clicked to expand/collapse its report details.

3

Part Bounding Box

The dimensions of the bounding box for the part.

Part Volume

The volume of the part.

Stock size

The dimensions of the stock.

Faces machined

The number of faces that are were machined for this part’s toolpath / strategy compared with the number of faces in the part.

Info

For an example of how to use the Report tab, see Using the Cycle Time Estimator.

report.drawio.pngImage Removed

These cycle time estimates can be exported to a CSV (Comma-Separated Values) file of your choice (see Export tab).

report.drawio.pngImage Added