Note |
---|
Before using this tab, you must have selected at least one file in the Upload tab then clicked Run. |
After clicking Run, the ‘Report’ tab is populated with specific information for each of the part files selected in the Upload tab.
Info |
---|
For an example of how to use the Report tab, see Using the Cycle Time Estimator: an Example. |
The following table contains details of all the information contained within the ‘Report’ tab, as shown in the screenshot to the right.
# | Information | Description | ||
---|---|---|---|---|
1 | Results created at | The date and time that the estimates were calculated. | ||
2 | Part file name | The name of the part file (and its Fusion path).
| ||
3 | Part Bounding Box | The dimensions of the bounding box for the part. | ||
Part Volume | The volume of the part. | |||
Stock size | The dimensions of the stock. | |||
Faces machined | The number of faces that were machined for this part’s toolpath strategy compared with the number of faces in the part. |
Info |
---|
For an example of how to use the Report tab, see Using the Cycle Time Estimator. |
These cycle time estimates can be exported to a CSV (Comma-Separated Values) file of your choice (see Export tab). |