After clicking Run, the ‘Export’ tab can be used to export a CSV file that contains details of the cycle time estimations (see Choose File(s) Tab).
Info |
---|
For an example of how to use the Cycle Time Estimates tab, see Using the Cycle Time Estimator: an Example. |
The following table lists details of all the features contained within the ‘Export’ tab, as shown in the screenshot to the right.
# | Information | Description | ||
---|---|---|---|---|
1 | Part file | The name of the part file. | ||
2 | File selector checkbox | Click the checkbox to the left of the part file to indicate that its cycle time estimation is to be exported. | ||
3 | Quantity | The quantity of the associated part that is to be exported (this will multiply the ‘Total’ cycle time’).
| ||
4 | Estimated time (H:MM:SS) | The ‘Machine Group’ and ‘Total’ time taken to complete machining for the part Total time is the sum of all Machine Group times for the part (rounded up to the nearest second).estimated cycle time (as shown in the Cycle Time Estimates tab) multiplied by the ‘Quantity'. | ||
Export Options | ||||
5 |
| |||
6 | ||||
7 |